8d Bim Modelling Tool For Accident Prevention Through Design

BIM D

BIM – Building Information Modeling – is a process that involves creating and using an intelligent 3D model to inform and communicate project decisions. It has various components:

  • 2D  2-Dimensional view
  • 3D  3-Dimensional Model
  • 4D  + Time Schedule
  • 5D  + Budget (Cost)
  • 6D  + Facilities management (Maintenance)
  • 7D  + Sustainability (Life Cycle)
  • 8D  + Occupational safety and health

1.    BIM

Building Information Modeling (BIM) is a digital representation of physical and functional characteristics of a facility. A BIM is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle; defined as existing from earliest conception to demolition.

2.    BIM software

Building Information Modeling (BIM) is an intelligent 3D model-based process that gives architecture, engineering, and construction (AEC) professionals the insight and tools to more efficiently plan, design, construct, and manage buildings and infrastructure.

3.    3D BIM – The shared information model

3D BIM is the process of creating graphical and non-graphical information and sharing this information in a Common Data Environment (CDE). This refers to traditional 3D Model what we are creating and CAD Software.

Benefits

  1. Improved visualization of the project, communication of design intent
  2. Improved multidisciplinary collaboration
  3. Reduced rework

4.    4D BIM – Construction sequencing

4D = 3D + TIME SCHEDULE

4D BIM adds an extra dimension of information to a project information model in the form of scheduling data. This data is added to components which will build in detail as the project progresses. This information can be used to obtain accurate programme information and visualisations showing how your project will develop sequentially.

Activity Planning in4D, 4D Scheduling / Construction Sequencing. … These animated models represent the planned construction sequence set against time. The main purpose of a construction phasing simulation is to provide a tool that will help the construction team visualize logistical issues or inefficiencies.

Benefits
Integrating BIM with 4D CAD simulation models bring benefits to participants in terms of planning optimization.
Builders and manufacturers can optimize their construction activities and team coordination.

5.    5D BIM – Cost

5D = 3D + TIME SCHEDULE + COST.

5D BIM, an acronym for 5-dimensional building informationmodelling, is a term used in the CAD and construction industries, and refers to the intelligent linking of individual 3D CAD components or assemblies with time schedule (4D BIM) constraints and then with cost-related information.

Drawing on the components of the information model being able to extract accurate cost information is what's at the heart of 5D BIM.

Project Management in5D, Project controlling in5D In5D schedules and costs are linked to the 3D models.

Benefits
Integrating BIM with 5D CAD simulation models enables the development of more efficient, cost-effective and sustainable constructions.

6.    6D BIM – Project lifecycle information

6D = 3D + TIME SCHEDULE + COST + INTELLEGENT LINKING

Operations and Maintenance in6D and

6D BIM stands for6D Building InformationModeling. It is a phrase extensively used in the AEC industry and refers to the intellectual linking of all the individual 3D CAD components or assemblies with all aspects of project life-cycle management information

Benefits
Integrating BIM with 6D CAD simulation models leads to an overall reduction in energy consumption.

7.    7D BIM – Sustainability

7D = 3D + TIME SCHEDULE + COST + INTELLEGENT LINKING + SUSTAINABILITY

7DBIM (seventh-dimensional building information modelling) is used by managers in the operation and maintenance of the facility throughout its life cycle. … IntegratingBIM with7D CAD simulation models optimizes asset management from design to demolition.

Benefits
Integrating BIM with 7D CAD simulation models optimizes asset management from design to demolition.

8.    8D BIM – Prevention through Design (PtD)

8D = 3D + TIME SCHEDULE + COST + INTELLEGENT LINKING + SUSTAINABILITY + PREVENTION

8D BIM Modelling Tool For Accident Prevention Through Design

But until now the tools for effectively managing the links between design and safety on site have not been available. Building information modelling (BIM) is an emerging paradigm in the design and engineering field.BIM Ds

Now ARES Commander 2020 has BIM capabilities.

– In ARES Commander 2020 you can work with BIM files

  • Import IFC or Revit® files in your project
  • BIM Navigator palette
  • Data Extraction for BIM Elements
  • BIM Elements Properties

  • BIM Model Sections

Download latest version of ARES Commander today and experience it.

https://www.graebert.com/cad-software/download/

ARES Commander is a product from Graebert GmbH.  Graebert GmbH is a leading developer of custom CAD software, solutions and services and has over 30 years of technology expertise…

Disclaimer: I work forGraebert GmbHand occasionally write forCAD -Tips and Tricks.

8d Bim Modelling Tool For Accident Prevention Through Design

Source: https://cadblogbyamit.wordpress.com/2019/12/01/bim-ds-2d-3d-4d-5d-6d-7d-and-8d-and-benefits/

Posted by: tapleyherwas.blogspot.com